India's first dual elevated eastern cross taxiways (ECT) and fourth runway at Indira Gandhi International Airport to be inaugurated on July 13
It will connect the northern and southern airfields and the taxiing time will be reduced by half and will take 10 to 12 minutes. It is a 2.1-km-long and 202-metre-wide taxiway and is capable of handling large aircraft and wide-body jets such as A380, B777, and B747-8.
It will connect the northern and southern airfields and the taxiing time will be reduced by half and will take 10 to 12 minutes. It is a 2.1-km-long and 202-metre-wide taxiway and is capable of handling large aircraft and wide-body jets such as A380, B777, and B747-8.
India's first dual elevated eastern cross taxiways (ECT) and fourth runway at Indira Gandhi International Airport to be inaugurated on July 13
It will connect the northern and southern airfields and the taxiing time will be reduced by half and will take 10 to 12 minutes. It is a 2.1-km-long and 202-metre-wide taxiway and is capable of handling large aircraft and wide-body jets such as A380, B777, and B747-8.
0 Commenti
0 condivisioni
725 Views
0 Anteprima